Bridging Loans News:- The construction of GLENGALL QUAY – 484 FLATS AND RETAIL SPACE is underway at 45-59 Millharbour, 2-4 Muirfield Crescent & 16, 21 & 23-39 Pepper Street, Poplar, London, E14 9TD. The plan is to construct 3 mixed use buildings. The value stands at £150M. The whole of the construction is to be governed by the Tower Hamlets council. The approximate duration for which the project will continue is 30 months. With a floor area of 7362 sq. metres and site area of 7000 sq. metres, the 3 buildings will be having 45 Storeys in total, in which 484 units will be accommodated.
There will be 223 one bed houses, 169 two bed houses, 80 three bed houses and 12 four bed houses. Additionally, there will be one Storey below the ground as well. 11 parking spaces will be allotted. Sustainable Homes has rated the construction 4 stars and the BREEAM rating is excellent. The funding has been taken care of by HZA.
Bridging Loans – HANK ZARIHS ASSOCIATES
The main client is Healey Development Solutions Limited and Meadow Residential LLP with Mr. Alex Vogel, Development manager as the main contact. 3D Reid (Architects) Limited is the architect with GVA Grimley Limited being the planner. Their main contacts are Mr. Richard Fairhead, Divisional Director and Miss Elizabeth Woodall, Senior Planner respectively. Mr. Adam Conchie, planner is also a contact for GVA Grimley Limited.
The landscape architect is the Exterior Architecture along with Peter Stewart Consultancy. The Mech. & Electronic engineer chosen for this construction is Waterstone Designs. The civil engineer is Elliot Wood Partnership Head Office. Meadow Residential LLP is the project manager with Mr. Alex Vogel, Development manager as the main contact. The construction of GLENGALL QUAY – 484 FLATS AND RETAIL SPACE is expected to go very smoothly as the help and support of HANK ZARIHS ASSOCIATES in every aspect has been phenomenal.