Instant Bridging Loans:- The construction of WINWICK STREET, JOHN STREET – 362 FLATS, COMMERCIAL UNIT & MULTI – STOREY CARPARK has started at Land at Winwick Street and John Street, Warrington, Cheshire, WA2 7UB. The council of Warrington is under the governance of this construction. The project has started in December 2018 and is expected to finish by May 2021, lasting over a period of approximately 29 months. The total site area is 9400 sq. meters.
There will be 362 units constructed in total, and it will comprise of 9 storeys. There will be 253 one bed houses, along with 106 two bed houses and 3 four bed houses. The net retail floor space is 593 sq. meters. There will be 849 parking spaces allotted. The total finance value for this project is £45M.
More about WINWICK STREET, JOHN STREET – 362 FLATS, COMMERCIAL UNIT & MULTI – STOREY CARPARK
The main client is The High Street Group. Triangle Architects is the main architect. The planner is Nathaniel Lichfield and Partners. The landscape architect is TEP Limited. The Mech. & Elec. Engineer is Patrick Parsons Limited. Alan Johnson Partnership is the structural engineer and the civil engineer as well. The transport consultant is SK Transport Planning.
JPM Acoustics is the Acoustic Consultant. The fire engineering consultant is BB7 Fire Engineers. The Survey Operations Limited is the surveyor. Nobles Construction is the contractor. Conform Northwest Limited is the foundations subcontractor and the groundworks subcontractor.
Instant Bridging Loans-How can HZA help?
The investors and developers of the WINWICK STREET, JOHN STREET project, can benefit profoundly from the real estate capitals offered by HZA. The property development finance brokers Hank Zarihs Associates is currently available to provide support and advice on sourcing instant bridging loans for the many facets of the project. They have a strong track record for helping to find appropriate commercial bridging loans to smooth the construction process.